Skip to content
Factory projects · 11

Complex factory project

A high-capacity factory with the full flow: cutting, edge banding, drilling, sorting, packaging and assembly.

Two parallel lines sharing one store
Two parallel lines sharing one store
  1. 01 A higher level of integration for higher capacity.
  2. 02 Standard full-factory project cells are defined.
  3. 03 Customer data due diligence is required.
  4. 04 Line controls and cell controls are applied.
  5. 05 Complexity management: cutting → edging → drilling → sorting → packaging → assembly.

Layouts

Example layouts from Caelus projects. The final layout is designed for your own floor.

Factory layout: cutting and storage, edge banding, drilling, sorting, packaging
Factory layout: cutting and storage, edge banding, drilling, sorting, packaging

Send us your floor plan.
We design your cell.